El Camino Real Water Main Improvements Project

City Project No. 83510


This project replaced 3,125 linear feet of a 1914 water main underneath a busy state highway. This project improved water quality and fire flow to the surrounding community.

Scope
: The work consisted of installing approximately 2,900 linear feet of new 4-inch, 6-inch, 8-inch and 10-inch Ductile Iron (DI) water main on El Camino Real, between Broadway and Hillside Drive; El Camino Real at Ray Drive/Rosedale Avenue; and El Camino Real at Murchison Drive in the City of Burlingame, together with all service connections, valves, fittings, fire hydrants, and appurtenances and other work required to make a complete and operable system. The existing water mains were abandoned in place. The construction method was conventional open trench. 