Mandatory Measures checklists must be submitted with a building permit application for the following projects:

All New Residential Buildings:
New residential buildings must be designed to include the Green Building mandatory measures specified in this checklist. These Green Building mandatory measures also apply to additions or alterations of existing residential buildings where the addition or alteration increases the buildings conditioned area, volume, or size. These requirements apply only to the specific area of addition or alteration.

2016 CALGREEN Mandatory Measures - Residential Checklist

Alterations or Additions to Existing Non-Residential Buildings:
Building additions of 1,000 square feet or more AND/OR building alterations with a permit valuation of $200,000 or more must be designed to include Mandatory Green Building Measures outlined in this checklist.

2016 CALGREEN - Non-Residential Alterations and Additions Checklist

All New Non-Residential Buildings
New non-residential buildings must be designed to include the Green Building mandatory measures specified in this checklist.

2016 CALGREEN - Non-Residential New Building Checklist