The following summarizes the findings of an energy efficiency study conducted in 2002 for the City of Burlingame under the California Energy Commission's Energy Partnership Program. This study reviews the City's major energy using systems (these facilities are listed below). After review of the historical energy use, potential projects were determined and analyzed based on cost effectiveness.
This program provides technical assistance through energy audits, analyses, and low interest loans to California City and County governments in order to identify, install, and finance energy efficiency projects. The goal of the program is to reduce energy costs through the implementation of energy reduction measures in existing systems.
Facility Background and Site Information
The facilities audited have a combined building area of 136,825 square ft. with each facility's area as shown below:
Facility | Area (sq. ft.) |
City Hall |
26,000 |
Library |
48,000 |
Police Station |
13,500 |
Fire Station #34 |
12,303 |
Fire Station #35 |
5,616 |
Fire Station #36 |
8,906 |
Golf Center |
1,500 |
Recreation Center |
21,000 |
Driving Range |
NA |
Total Building Area |
136,825 |
Recommended Energy Projects
Facility |
Project Description |
Annual Cost |
Project Cost |
Projected |
City Hall |
Convert LED Exit Signs in place of PL lamp based EXIT signs |
[1] |
[1] |
2003 |
City Hall |
Replace old chiller and boiler at City with new water colled chiller and a new high efficiency boiler |
$2,593 |
$90,865 |
2009-10 |
City Hall |
Convert City Hall HVAC system controls from Pneumatic to Direct Digital Control |
$3,998 |
$71,830 |
2012-13 |
City Hall |
Convert City Hall Constant Volume Reheat Air Handlers to VAV Reheat Systems |
$7,180 |
$84,710 |
2016-17 |
City Hall |
Provide a 1-KW Grid, grid connected PV System for City Hall |
$2,276 |
$55,000 |
not budgeted |
F.S. 35 |
Convert incandescent fixtures in equipment room to fixtures with T8 lamps and electronic ballasts |
[1] |
[1] |
2003-04 |
F.S. 35 |
Replace Fire Station 35 Furnaces with new, high efficiency condensing furnaces |
$351 |
$4,384 |
2010-11 |
F.S. 36 |
Convert incandescent fixtures with T8 lamps and electronic ballasts in apparatus room |
[1] |
[1] |
2004-05 |
Golf Center |
Convert down lights from incandescent to PL 13 compact fluorescent lamps in Pro Shop |
[1] |
[1] |
2002-03 |
Golf Center |
Relocate Lighting Control Panel in golf Center to allow convenience switching of Drive Range and Putting range Metal Halide Lights when they are not in use |
$748 |
$2,885 |
not budgeted |
Library |
Convert table & standing lamps on main & lower levels from incandescent to PL 13 compact fluorescent lamps |
[1] |
[1] |
2002-03 |
Library |
Provide stack area lighting controls for the new Library building |
$2,329 |
$11,066 |
not budgeted |
Library |
Reduce excess emergency lighting level in library nigh light/emergency fixtures using District staff |
$1,051 |
$700 |
2002-03 |
Police Station |
Convert LED Exit Signs in place of PL lmap based EXIT signs |
[1] |
[1] |
2004-05 |
Police Station |
Retrofit fluorescent fixtures in the Police Station to StarCoat T8 lamps and low ballast factor electronic ballasts |
$2,790 |
$14,479 |
2007-08 |
Police Station |
Convert Police Station VAV System with inlet vanes to a VAV system using Variable Frequency Drives |
$2,226 |
$23,848 |
2009-10 |
Police Station |
Convert Police Station HVAC system controls from Pneumatic to Direct Digital Control |
$5,015 |
$53,759 |
2012-13 |
Rec Center |
Switch Electricity Account from Rate A-1 to Rate A-10 |
$3,680 |
$0 |
2002-03 |
Rec Center |
Convert incandescent fixtures to compact fluorescent lamps; Convert fixtures to T8 lamps and electronic ballasts; provide LED Exit Signs |
[1] |
[1] |
2002-03 |
Rec Center |
Replace old condensing units of Recreation Center with new high efficiency condensing units |
$2,239 |
$37,045 |
2008-09 |
Rec Center |
Replace old hot water heating boiler in the Recreation Center with a new higher efficiency boiler |
$1,072 |
$19,208 |
2010-11 |
[1] |
Projected as one total project |
$1,412 |
$9,362 |
|
Totals |
$38,962 |
$479,141 |