Vancouver Bridge Repair
This project consisted of repairing the Vancouver bridge that spans the storm drain channel that serves Easton Creek. A portion of the embankment wall of the channel eroded away and created a void, resulting in a sink hole and compromising the structural integrity of the bridge foundation. This project was completed on August 1, 2018.
Scope: The work consisted of temporary bypass of stream flows, excavation, removal of portions of existing corrugated metal pipe (CMP), installation of new storm drain pipe, concrete work to construct support for structure, backfill and repaving, complete in place.