Easton Addition, Ray Park, and Neighborhood Sewer Rehab, Phase 1

City Project No. 84190


This project is the first of a 5 phased project, Phase 1 concentrated on pipelines in Ray Park Subdivision and Skyline Blvd easements. This project replaced and upsized existing deteriorated vitrified clay pipes that have high inflow and infiltration with new polyvinyl chloride and high-density polyethylene pipe. This project reduces inflow and infiltration towards the wastewater treatment plant and complies with the Bay Keepers mandate. This project also rehabilitated wet wells at the Airport Pump Station and the Hyatt Pump Station thus extending their life spans.

Scope
: The work shall consist of constructing approximately 5,850 LF of new 6-inch, 8-inch through 10-inch sanitary sewer pipe and 12-inch storm drain pipe throughout the City using open cut, pipe bursting, and other trenchless methods in the public right-of-way, along easement areas, and in private properties. Other related work includes installation and replacement of manholes, cleanouts and laterals by pipe bursting, or open cut, rehabilitation of manholes, temporary bypass pumping, connecting all laterals, rehabilitation of two pump stations, and other related miscellaneous works.

Plan Holder's List

Bid Summary