Skip to page body Home About Burlingame Community Business Visitors Departments I Want To ...
top menu graphic
Community Development
Safeway Project
1450 Howard Avenue

Safeway View
CITY COUNCIL APPROVES THE SAFEWAY PROJECT

The City Council held a public hearing to consider the Safeway project on Monday, February 1, 2010 at 7:00 p.m. in the Council Chambers, Burlingame City Hall, 501 Primrose Road, Burlingame.  The Council, by a 5-0 vote, approved the project with amended conditions to clarify some of the details of the project.

Council Staff Report (PDF)
Attachment A (PDF)
Attachment B
(PDF)
Attachment C-1 (PDF)
Attachment C-2 (PDF)
Attachment D (PDF)

On January 11, 2009, the Planning Commission made a recommendation to the City Council to approve the Safeway Project at 1420 - 1450 Howard Avenue and 249 Primrose Road.  The applications requested are Mitigated Negative Declaration, Commercial Design Review, El Camino setback Variance, Conditional Use Permits for height, 24-hour operation of a grocery store, sale of alcoholic beverages and take out services, Rezoning of a portion of the site from R-3 to C-1, and tentative parcel map for lot combination, for replacement of the existing Safeway with a new Safeway store, a new retail office building and renovation of an existing retail building. 

APPROVED PLANS
Plans dated December 23, 2009 and January 11, 2010
A1.1 - Site Plan (PDF - 474 KB)
A1.2 - Pedestrian Circulation (PDF - 1.17 MB)
A2.4 - Safeway Elevations (PDF - 557 KB)
A2.5 - Safeway Elevations (PDF - 564 KB)
A2.7 - Safeway Views (PDF - 1 MB)
A2.8 - Safeway Views (PDF - 1 MB)
A2.9 - Safeway Stair Views (PDF - 916 KB)
A3.2 - Corner Building Elevations (PDF - 570 KB)
A3.3 - Corner Building Elevations (PDF - 594 KB)
A3.5 - Corner Building Views (PDF - 1 MB)
A3.6 - Corner Building Views (PDF - 907 KB)
A4.4 - Wells Fargo Building Elevations (PDF - 567 KB)
A4.5 - Wells Fargo Building Elevations (PDF - 631 KB)
A4.7 - Wells Fargo Building Views (PDF - 926 KB)
A5.1 - Site Views (PDF - 1.2 MB)
A5.2 - Site Views (PDF - 1 MB)
L1.1 - Landscape Plan (PDF - 2.6 MB)
L1.2 - Roof Garden Landscape Plan (PDF - 1.6 MB)

Mitigated Negative Declaration
On November 12, 2009, the Mitigated Negative Declaration for the proposed Safeway project was completed and is now available for public review.  A Mitigated Negative Declaration is a finding that based on the analysis of the project, and based on the proposed mitigation measures, it will not have a significant effect on the environment.  The full Draft Initial Study for the project is available for download below.

Safeway Project Draft Initial Study and Mitigated Negative Declaration

Cover and Table of Contents (PDF - 460 KB)
Introduction (PDF - 112 KB)
Project Information (PDF - 940 KB)
Project Description (PDF - 3.9 MB)
Evaluation of Environmental Impacts
Land Use (PDF - 308 KB)
Population & Housing (PDF - 112 KB)
Geology & Soils (PDF - 168 KB)
Hydrology & Water Quality (PDF - 198 KB)
Air Quality (PDF - 194 KB)
Traffic (PDF - 2.2 MB)
Biology (PDF - 317 KB)
Hazards & Mineral Resources
(PDF - 185 KB)
Noise (PDF - 172 KB)
Public Services/Recreation (PDF - 160 KB)

Utilities (PDF - 171 KB)
Aesthetics (PDF - 160 KB)
Cultural Resources & Agriculture
(PDF - 169 KB)
Mandatory Findings of Significance
(PDF - 104 KB)
Appendix A: (PDF - 543 KB)
Air Quality & Greenhouse Gas Calculations
Appendix B: Traffic Study, Part 1 (PDF - 2.2 MB)
Appendix B: Traffic Study, Part 2 (PDF - 178 KB)
Appendix C: 
Electrical Plan & Photometric Study
Part 1 (PDF - 6.9 MB)
Part 2 (PDF - 6.2 MB)

Description of Safeway Project:  An application has been submitted for Environmental Review, Commercial Design Review, El Camino Real Setback Variance, Conditional Use Permits for height and hours of operation, and Rezoning of a portion of the site from the R-3 District to the C-1 District for replacement of the existing Safeway with a new 45,645 square foot store with a 6,190 square foot mezzanine. A new two-story retail/office building with 12,428 square feet of retail space on the ground floor and 5,460 square feet of office on the second floor is also proposed. The existing Safeway and Walgreens buildings would be demolished. The existing building at 249 Primrose Road, formerly a Wells Fargo Bank, will be remodeled as a part of the project.

The site is zoned C-1 and R-3, and consists of five parcels, totaling 3.44 acres. The parcels would be merged as a part of the project. A total of 206 on-site parking spaces are proposed, including 103 spaces on the roof of the Safeway store, accessed by a ramp.

Processing Status: The project was submitted April 23, 2009. The project has been reviewed for completeness, and determined to be complete.  On June 22, 2009, the Planning Commission held an Environmental Scoping and Design Review Study Session and received comments from the Commission and the project.  (See June 22, 2009 Planning Commission Minutes).  The environmental document is now complete, and the public hearing to comment on the Mitigated Negative Declaration and the project has been scheduled for Monday, December 14, 2009 at 7:00 p.m. in the Council Chambers of Burlingame City Hall, 501 Primrose Road, Burlingame.

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Download Acrobat Reader    Download Word Viewer    Download Excel Viewer    Download PowerPoint Viewer    Download Visio Viewer